ORDOFRAME / MACHINE BUILDER EDITION

Quote more work without hiring.

Layout, cycle time and proposal from one model, so they always agree.

Ordoframe is a pre-sales engineering platform for engineered-to-order systems. Its first edition, for machine builders, turns an RFQ into a priced concept and proposal in an afternoon.

Ordoframe concept of an adhesive dispense and inspect line: the 3D layout generated from the job description, with its general arrangement drawing and cycle-time chart. 33.9 s cycle, 98 parts an hour, 14 steps.
Ordoframe concept of an adhesive dispense and inspect line: the 3D layout generated from the job description, with its general arrangement drawing and cycle-time chart. 33.9 s cycle, 98 parts an hour, 14 steps.

106

component types in the Machine Builder library

~0.1 s

to generate a 20-component line

7

safety standards in the concept screen, OSHA 1910 to ISO 13855

01 / THE CURRENT PROCESS

Four tools. Four sources of truth.

2D/3D CAD for the layout.

Excel for the cost.

PowerPoint for the presentation.

Word for the proposal.

Built by hand for bids you mostly won’t win.

02 / ONE ENGINEERING MODEL

One model, every document.

One spec feeds the layout, drawings, throughput, safety screen, requirements and proposal. Change the spec once. Keep every document in agreement.

Specification

Layout and drawings

3D renders

Throughput analysis

Safety screen

Requirements

Priced proposal

03 / FROM RFQ TO PROPOSAL

Concept it. Price it. Present it.

01

CONCEPT IT

Turn the brief into a coherent equipment concept, with requirements and assumptions visible.

Layout, sizing, clash and reach checks

02

PRICE IT

Connect the engineering concept to your cost model. Price the work you intend to deliver.

Your cost model. Margins stay internal; only released prices reach a customer document

03

PRESENT IT

Produce a proposal and supporting documents that agree with the same engineering model.

Word proposal with compliance matrix, DXF/PDF drawings, STEP, SysML v2, ReqIF, PowerPoint

04 / POSITIONING

“CPQ prices what you have already engineered. This engineers it so you can price it.”

05 / CHECKS

Checked as it’s built.

Clashes, impossible reaches and fit; cycle, bottleneck and throughput; guarding, reach and stopping distances screened against:

OSHA 1910.212 · OSHA 1910.147 · NFPA 79 · UL 508A · ANSI B11.19 · ISO 13857 · ISO 13855

A screen for your design review, not a certification. Every sheet is marked not for construction.

06 / WORKED EXAMPLE

Adhesive Dispense and Inspect

Adhesive bead dispensed around the top of the part, then measured with a 3D laser scan: one frameset, two stations.

14
process steps

33.9 s
modeled cycle, one part end to end

35 s
between finished parts: the frameset, both stations

98/h

throughput at 95% availability

Our own machine, not a customer result. Figures are the Studio’s own model of the concept, not a validated cycle.

A concept that misses

Asked for 80 an hour. The model says 62.

105 s

modeled cycle

53 s

held at the dispense station

62/h

MISSES the 80/h target by 18/h

Found in an afternoon, not in month four.

07 / YOUR DATA

Your margins stay internal

Sign in with Microsoft or Google work accounts.

Your RFQ stays in your browser

The file is read in the page. Only the extracted requirements are saved to your account.

Your margins stay internal

Rates, hours and margins are saved in your own account and never reach a customer document: a price gate refuses any document that would show them. Only prices you release go in.

Your own tenant

Every request is tied to your company’s tenant. Components you design stay yours.

Work-account sign-in

Microsoft or Google work accounts, linked to your company by tenant or domain, never by email address. Or single sign-on through your own identity provider.

Hosted on Render, whose platform is SOC 2 Type 2 audited and ISO 27001 certified.

NEXT STEP

Spec it, free — coming soon

Bring your next RFQ.

Book a call to walk through your quoting process.

© 2026 Ordoframe Inc.

© 2026 Ordoframe Inc.

© 2026 Ordoframe Inc.